Description
Technical Specifications
| Parameter | Specification |
|---|---|
| Manufacturer | General Electric |
| Model | IS200LSGIH1APR |
| Load Shedding Functions | Load reduction coordination, priority-based shedding, emergency control |
| Gateway Functions | Data routing, protocol conversion, system coordination |
| Highway Interface | 2× bus highway ports (GE proprietary protocol) |
| Supported Protocols | GE highway, Modbus RTU, DNP3 |
| Protection Functions | Under-frequency load shedding, under-voltage protection coordination |
| Power | +5V DC / 2.0A, ±15V DC / 0.4A |
| Temp Range | -30°C to +65°C |
| MTBF | > 108,000 hours |
| Suffix Meaning | “APR” = specific firmware/configuration for load shedding and protection |
Advantages and Key Features
Dedicated Load Shedding and Gateway Interface: The IS200LSGIH1APR provides specialized load shedding coordination and gateway communication.
Load Shedding Management: Priority-based load reduction during emergencies.
Protection Coordination: The IS200LSGIH1APR coordinates under-frequency and under-voltage protection.
Highway Communication: Integrates with distributed control and protection networks.
Application Fields and Case Studies
Used in load shedding applications, emergency load reduction systems, and grid disturbance management. In a 600 MW plant, the IS200LSGIH1APR provided reliable load shedding coordination during grid frequency events.
Comparison with Competing Products
| Dimension | IS200LSGIH1APR | IS200KTURH1AAA | IS200ERBPG1ACA |
|---|---|---|---|
| Primary Function | Load shedding + gateway | Keypad + RTD + highway | Relay/breaker protection |
| Load Shedding | Yes | No | No |
| Gateway Function | Yes | No | Yes |
| VME Integration | Direct | Direct | Direct |
Selection Recommendations
Choose IS200LSGIH1APR for load shedding coordination and gateway applications. Verify “APR” firmware matches your specific load shedding and protection requirements. Deploy for emergency load management systems.
Precautions and Important Notes
Use ESD-safe handling. Verify field wiring and highway connections. Confirm “APR” firmware supports your specific load shedding and protection requirements. Never interrupt firmware updates. Board draws 2.0A – verify rack power capacity. Document all configurations. Store spares in anti-static packaging. Do not mix variants in redundant pairs. Allow 30 seconds boot time. Test all load shedding and gateway functions during commissioning. The IS200LSGIH1APR is critical for load shedding management – ensure all settings are verified before placing in service. Ensure highway cabling does not exceed maximum recommended length. Regular verification of load shedding and protection coordination is recommended.

A-B 1756-IF16
MITSUBISHI QD75D4N
A-B 1769-OF4CI/A
ABB D674A906U01


Reviews
There are no reviews yet.