Description
Technical Specifications
| Parameter | Specification |
|---|---|
| Manufacturer | General Electric |
| Model | IS200SCNVG1A |
| Serial Interfaces | 2× configurable serial ports (RS-232 / RS-485) |
| Signal Conversion | Analog-to-digital, digital-to-analog conversion |
| Voltage Monitoring | Voltage level monitoring, status reporting |
| Gateway Functions | Data routing, protocol conversion, network integration |
| Communication | Serial interfaces, highway integration |
| Supported Protocols | Modbus RTU, GE serial protocols |
| Functions | Signal conversion, voltage monitoring, gateway communication |
| Power | +5V DC / 2.0A, ±15V DC / 0.4A |
| Temp Range | -30°C to +65°C |
| MTBF | > 108,000 hours |
| Revision Note | “A” suffix = specific hardware/firmware configuration |
Advantages and Key Features
Dedicated Signal Conversion, Network, and Voltage Gateway: The IS200SCNVG1A provides specialized signal conversion, voltage monitoring, and network integration with gateway communication.
Signal Conversion: The IS200SCNVG1A handles analog-to-digital and digital-to-analog conversion.
Voltage Monitoring: Provides voltage level monitoring and status reporting.
Gateway Functions: Enables data routing and network integration.
Application Fields and Case Studies
Used in signal conversion applications, voltage monitoring systems, and network-integrated gateway communication. In a 600 MW plant, the IS200SCNVG1A provided reliable signal conversion and voltage monitoring with gateway functions.
Comparison with Competing Products
| Dimension | IS200SCNVG1A | IS200SAMBH1A | IS200PSCDG1ADB |
|---|---|---|---|
| Primary Function | Signal conversion + voltage gateway | Serial + analog + module | Power supply + control data gateway |
| Signal Conversion | Yes | Yes | No |
| Voltage Monitoring | Yes | No | Yes |
| VME Integration | Direct | Direct | Direct |
Selection Recommendations
Choose IS200SCNVG1A for signal conversion, voltage monitoring, and network gateway applications. Verify compatibility with your specific signal types and voltage monitoring requirements. Deploy for signal processing and conversion systems.
Precautions and Important Notes
Use ESD-safe handling. Verify field wiring and signal connections. Confirm compatibility with your specific signal types and voltage monitoring requirements. Never interrupt firmware updates. Board draws 2.0A – verify rack power capacity. Document all configurations. Store spares in anti-static packaging. Do not mix variants in redundant pairs. Allow 30 seconds boot time. Test all signal conversion, voltage monitoring, and gateway functions during commissioning. The IS200SCNVG1A is critical for signal conversion and voltage monitoring – ensure all settings are verified before placing in service. Ensure signal cabling is properly shielded to avoid noise interference. Regular verification of signal accuracy and voltage levels is recommended. Ensure communication cabling does not exceed maximum recommended length.
.jpg)
MITSUBISHI MR-J2S-200A
FOXBORO FBM204
A-B 1756-PA75
A-B 1756-L55

.jpg)
Reviews
There are no reviews yet.