Description
Technical Specifications
| Parameter | Specification |
|---|---|
| Manufacturer | General Electric |
| Model | IS200JPDVG1A |
| Pulse Inputs | 4–8 pulse inputs (J-type, speed, flow, position sensors) |
| Data Validation | Pulse data validation, integrity checking, error detection |
| J-Type Gateway Functions | Data routing, protocol conversion, gateway communication |
| Supported Protocols | Modbus RTU, GE pulse protocols, J-type protocols |
| Communication | J-type serial interfaces, highway integration |
| Power | +5V DC / 2.0A, ±15V DC / 0.4A |
| Temp Range | -30°C to +65°C |
| MTBF | > 108,000 hours |
| Revision Note | “A” suffix = specific hardware/firmware configuration |
Advantages and Key Features
Dedicated J-Gateway Pulse Data Validation: The IS200JPDVG1A provides specialized pulse data validation and J-type gateway communication.
Data Validation: The IS200JPDVG1A handles integrity checking and error detection.
J-Type Gateway Functions: Enables data routing and protocol conversion.
Application Fields and Case Studies
Used in pulse data validation applications, J-type network integration requiring data integrity checks, and gateway communication for critical pulse data. In a 600 MW plant, the IS200JPDVG1A provided reliable pulse data validation and gateway communication.
Comparison with Competing Products
| Dimension | IS200JPDVG1A | IS200JPDSG1AEC | IS200JPDPG1A |
|---|---|---|---|
| Primary Function | Pulse data validation | Pulse data synchronization | Pulse data protection |
| Data Validation | Yes | No | No (protection, not validation) |
| VME Integration | Direct | Direct | Direct |
Selection Recommendations
Choose IS200JPDVG1A for pulse data validation and J-type gateway applications. Verify compatibility with your specific pulse sensors and validation requirements. Deploy for critical data integrity applications.
Precautions and Important Notes
Use ESD-safe handling. Verify field wiring and pulse connections. Confirm compatibility with your specific pulse sensors and validation requirements. Never interrupt firmware updates. Board draws 2.0A – verify rack power capacity. Document all configurations. Store spares in anti-static packaging. Do not mix variants in redundant pairs. Allow 30 seconds boot time. Test all validation and gateway functions during commissioning. The IS200JPDVG1A is critical for pulse data validation – ensure all settings are verified before placing in service. Ensure proper shielding for pulse signals to avoid noise interference. Regular verification of pulse data quality and validation performance is recommended. Ensure communication cabling does not exceed maximum recommended length.

AB 1784-PCICS
ULTRA SLIMPAK G448-0002
DALSA CR-GEN0-M6400R3


Reviews
There are no reviews yet.