Description
Technical Specifications
| Parameter | Specification |
|---|---|
| Manufacturer | General Electric |
| Model | IS200EPSMG1ABB |
| Communication Interfaces | 2× configurable ports (RS-485 / fieldbus) |
| Supported Protocols | Modbus RTU, DNP3, GE proprietary protocols |
| Power Supply Functions | UPS monitoring, battery charger status, DC distribution |
| Motor Control Functions | Start/stop, status monitoring, protection coordination |
| Supported Equipment | UPS systems, battery chargers, motor control centers, starters |
| Power | +5V DC / 2.0A, ±15V DC / 0.4A |
| Temp Range | -30°C to +65°C |
| MTBF | > 110,000 hours |
| Suffix Meaning | “ABB” = specific firmware for power/motor integration |
Advantages and Key Features
Integrated Power Supply and Motor Gateway: The IS200EPSMG1ABB combines UPS/battery monitoring with motor control in a single board, reducing system complexity and rack space.
Coordinated Protection: Enables coordination between power supply status and motor control, allowing automatic shutdown of non-critical motors during UPS/battery faults.
Multi-Protocol Support: Supports Modbus RTU and DNP3 for plant-wide integration.
Pre-Configured Firmware: The “ABB” firmware on the IS200EPSMG1ABB reduces commissioning time.
Comprehensive Diagnostics: Includes UPS/battery health and motor status monitoring.
Application Fields and Case Studies
Used in turbine auxiliary systems where power supply monitoring and motor control must be coordinated. In a 500 MW plant, the IS200EPSMG1ABB monitored UPS status and controlled auxiliary motors, automatically shedding non-critical loads during battery discharge events.
Comparison with Competing Products
| Dimension | IS200EPSMG1ABB | IS200EPSDG1AAB | IS200EPDMG1BAA |
|---|---|---|---|
| Primary Function | Power supply + motor | Power supply only | Power distribution + motor |
| UPS/Battery | Yes | Yes | No |
| Motor Control | Yes | No | Yes |
| VME Integration | Direct | Direct | Direct |
Selection Recommendations
Choose IS200EPSMG1ABB when your installation requires both power supply monitoring and motor control coordination. Select over separate power supply and motor boards for system consolidation and reduced rack space. Verify “ABB” firmware matches your equipment before commissioning.
Precautions and Important Notes
Use ESD-safe handling. Verify communication wiring and settings. Confirm “ABB” firmware supports your UPS and motor equipment. Never interrupt firmware updates. Board draws 2.0A – verify rack power capacity. Document all configurations. Store spares in anti-static packaging. Do not mix variants in redundant pairs. Allow 30 seconds boot time. Test both power monitoring and motor control functions during commissioning.

WESTINGHOUSE 1C31129G03
GE IC693PBM200-FE
B&R 8MSA4S.R0-31
FANUC A860-0301-T001 2000P


Reviews
There are no reviews yet.